Heavy Traffic Over the Bridge, Free Flowing Underneath; No Accidents or Construction to Blame June 27, 2021 James Bairaktaris Traffic over the Cribari Bridge was at a standstill getting into Saugatuck this evening, while traffic underneath was easy flowing. The Connecticut DoT had no indications of any roadwork or southbound motor vehicle accidents this evening, although traffic jams could be felt all the way through Greenwich this evening. Becoming a usual evening occurrence, traffic heading south brings local roads to a standstill many evenings as some avoid the highway altogether, crowding the less-traveled streets and clogging the few river crossings available.