Bayberry Lane Bridge over Aspetuck Closed through November for Replacement

Town Engineer Keith Wilberg: 

Town Engineer Keith Wilberg has announced that the project to replace the Bayberry Lane Bridge over the Aspetuck River begins today. The scheduled closing date of the roadway is Thursday, April 28, and is expected to continue through November 30.

Local traffic be directed through the designated detour route - Easton Road to Coleytown Road to North Avenue to Lyons Plain Road to White Birch Road, or the reverse, as necessary. Proper road signage will be in place prior to the road closure date. Residents adjacent to the bridge have been notified of the road closure and detour.

Emergency services in Westport and Weston will be notified, as will the Westport Public Schools Busing Representative. 

Motorists are advised to drive with additional caution, allow extra travel time, and obey all detour and safety signals. 

Please direct any questions about the project and detour to Town Engineer Keith Wilberg at 203-341-1128.

Previous
Previous

Structure Fire Reported at 1040 Post Road East, “Townhouse for Dogs and Cats”

Next
Next

Westport Country Playhouse Announces Podcast Series